Specifications

BPG initiates the Waste-to-Energy project based on the MSW sorting enterprise. The current stage of the project is installation of the pyrolysis equipment within the sorting workshop boundary. The MSW landfill is located at the surrounding area of the MSW sorting enterprise in Burgas area (Bulgaria).
Plant Specifications:

  • Input materials – MSW, RDF
  • Input capacity – 2-4 t/hour
  • Moisture of input raw – no more than 40%
  • Fraction of the input raw – no more than 50-500 mm
  • Output product – electric power, 6 MW/hour
  • Power consumption of the Plant – 445 kW/hour

The gases, emitted from the Plant, contain:
- dust – 5 mg/m3;
- SО2 – 20 mg/m3;
- NOx – 100 mg/m3;
- Сl – 4 mg/m3;
- F – 0.1 mg/m3.